Customization: | Available |
---|---|
Application: | Water Package |
Material: | Steel |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
THE MATERIAL OF THE MOLD | |
Mould cavity | Germany 2316 with HRC 42-45 |
Mould core | Germany 2316 with HRC 45-48 |
Mould neck | Germany 2316 with HRC 45-50 |
Valve Pin | SKD51 from Japan with HRC 58-60 |
Valve Pin heat Isolation pad | America Dupont can withstand 350 degrees temperature |
Hot runner nozzle | America Beryllium copper with HRC 37 |
Mould manifold plate | H13 from America with HRC 35-38 |
Mould other plate | P20 |
Other Specification of the Mould | |
Hot runner system | Hot runner system is made by our own factory, But the spare parts of the Hot runner is from Germany Hotest |
PID controller | Made by our own factory |
Guarantee for the Mould | 2 million shot times of 1 year |
Free spare parts of the mould | Core set : 1set/ cavity: 1 Piece/ hot runner system:1set/PID controller system: 1Set/ other easy broken spare parts for each 8cavities preform mould. |
The life of the mould | 5-6years ,Even in 10 years in good maintenance |
Installation & Commission | Our technician can be the buyer's factory to install and run the mould. But the buyer should bear all the cost for the technician's trip(include the air ticket, the cost of the accommodation and the salary) |
Cap mould: grinding--fly cutter--CNC Milling --Drilling --Lathe --Boring lathe --electric pulse --Finishing CNC -- EDM --Polishing --Installing -- Testing3.Interchangeable parts for every cavity.
1. R&D We support customers R&D. We will make the files or improve the design if you need
2. Quotation Making mould quotation will be finished in 1 or 2 days according to the drawing & sample which you supplied.
3. Negotiation The negotiation includes quality, price, material,delivery time,payment term,ect.
4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design.
5. Mould We will build the mould based on customers's requirements. Before making the mold, we will send mold design to the customers for approval firstly.
6. Mould Testing When mold is finish, we will test the mold to check if the product will be satisfied with customer's requirements, and we will send samples to the customers for approval.
7. Delivery We will delivery the goods to the customers either by sea or by air.FAQ
A: By T/T, L/C, Trade Assurance, Western Union.