The cap compression machine is mainly used to produce the mineral water caps, medical caps , the Juice drink caps, Milk bottle cap and other similar caps with more advantages thank the injection molding machine
1. The cap surface have no injection points with good outlook surface for future logo printing and engraving.
- The cap compression machine machine is with higher productivity than the injection machine production line to reduce the cap production cost.
- Less Energy Consumption than the injection molding machine to reduce the cap production cost.
- The cap compression machine is with the function of quick color changes to reduce the material wastage during cap color change.
5. The mold cost also will be less than the injection caps mold, If you want to producing another caps, then the cost for the mold will be less .
6. Machine mold have no hot runner system for less problems and the maintenance cost in future production .
7. Easy to operate than the injection molding machine.
MOULD MANUFACTURE PROCESS
Cap mould: grinding--fly cutter--CNC Milling --Drilling --Lathe --Boring lathe --electric pulse --Finishing CNC -- EDM --Polishing --Installing -- Testing3.Interchangeable parts for every cavity.
BUSINESS STEPS
1. R&D We support customers R&D. We will make the files or improve the design if you need
2. Quotation Making mould quotation will be finished in 1 or 2 days according to the drawing & sample which you supplied.
3. Negotiation The negotiation includes quality, price, material,delivery time,payment term,ect.
4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design.
5. Mould We will build the mould based on customers's requirements. Before making the mold, we will send mold design to the customers for approval firstly.
6. Mould Testing When mold is finish, we will test the mold to check if the product will be satisfied with customer's requirements, and we will send samples to the customers for approval.
7. Delivery We will delivery the goods to the customers either by sea or by air.
FAQ
Q: 1 Are you trading company or manufacturer ?
A: We are factory.
Q: 2 Where is your factory located?
A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 15 minutes from train station to our factory.
Q: 3. How to go to your factory?
A: You can come to our city by flight, bus or train.
It takes 2 hours by flight from Guangzhou to our city.
It takes 3.5 hours by train from Shanghai to our city.
It takes 1 hour by bullet train from Ningbo to our city.
Q: 4.How about quality control in your factory?
A: We believe "Quality is above everything". We have professional team to control the quality. Our QC team mainly do the following procedures:
A) Design Optimize control
B) Mould steel hardness Inspection
C) Mould assembly Inspection
D) Mould trial report and samples Inspection
E) Final inspection for mould & packing before shipmentIf you have another question, pls feel free to contact us as below:
Q:5. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A:Yes.
DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models - This can save time and money in producing your parts.
Q: 6. What type of plastic material is best for my design/component?
A: Plastic Materials selection depends on the application of your product. We will give you some suggestion after we checked the function of your component. And we can make the mould trial with different material according to your requirement.
Q: 7. What kind of mould can you make?
A: We can make all kinds of plastic injection moulds and blow moulds.
We can suggest you the proper cavity number as per your injection machines sizes.
Q:8. What's your payment method?
A: By T/T, L/C, Trade Assurance, Western Union.