4cavities Edible Oil Filp Top Cap Mould

Product Details
Customization: Available
Warranty: 1 Year
Shaping Mode: Injection Mould
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Spanish
to see all verified strength labels (27)
  • 4cavities Edible Oil Filp Top Cap Mould
  • 4cavities Edible Oil Filp Top Cap Mould
  • 4cavities Edible Oil Filp Top Cap Mould
  • 4cavities Edible Oil Filp Top Cap Mould
  • 4cavities Edible Oil Filp Top Cap Mould
  • 4cavities Edible Oil Filp Top Cap Mould
Find Similar Products

Basic Info.

Model NO.
C-009
Mould Cavity
Multi Cavity
Plastic Material
PP
Process Combination Type
Single-Process Mode
Application
Commodity
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
Customized
Customized
Customized
After-sales Service
1 Year
Packaging
Wooden
Transport Package
by Sea/by Air
Specification
Customized
Trademark
Daelong
Origin
China

Product Description

4cavities Edible Oil Filp Top Cap Mould

Taizhou Huangyan Daelong Mould Co., Ltd. (formerly Taizhou Huangyan Chengguan Hengyuan Mould Plastic Factory), since its establishment, has specialized in researching, developing and manufacturing preform moulds, bottle cap moulds and various other plastic moulds. We uphold the pursuit of quality and the integrity concept of being responsible to every customer, and we have been constantly improving and improving. Now the company has a complete set of advanced processing equipment, a group of professional and technical personnel with rich work experience, and a complete set of reasonable Management system. Design, production, quality inspection, supply and marketing and other departments fully implement standard assessments to ensure the continuous update of product quality, to ensure synchronization with international standards, and to meet market needs.
 

 

Technical Parameter:

Mould cavity S136 from Sweden ASSAB with HRC 50-52
Mould core S136 from Sweden ASSAB with or M310 from Austria with HRC 52-55
Mould core sleeve DC11 from Japan or W302 from Austria with 60-62HRC
Core Central Ejector Beryllium Copper + Chroming treatment with HRC 62-64 HRC
Ejector way Ejector plate+ Ejector sleeve
Mould Manifold plate H13 from America for hot runner mold.
Mould other plate P20
Hot runner system hot runner
Free spare parts of mould Core set : 1set/ cavity: 1 Piece/ hot runner system:1set/PID controller system: 1Set/ other easy broken spare parts for each 8 cavities cap mould.
Gurantee of the mould 1 year or 1 million shot times(in this period, if the mold have problem, we will offer the parts or service by free, but not include the problems cased by wrong operation)
The life of the mould 5-6 years, Even in 10 years in good maintenance
Installation & Commission Our technician can be the buyer's factory to install and run the mould. But the buyer should bear all the cost for the technician's trip(include the air ticket, the cost of the accommodation and the salary)
Remark: Our mould different part will used different material. All the material was important and special for making cap mould. The mould material choice can make sure the mould action and mould running life
 

MOULD MANUFACTURE PROCESS

Cap mould: grinding--fly cutter--CNC Milling --Drilling --Lathe --Boring lathe --electric pulse --Finishing CNC -- EDM --Polishing --Installing -- Testing3.Interchangeable parts for every cavity.

 

BUSINESS STEPS

1. R&D We support customers R&D. We will make the files or improve the design if you need

2. Quotation Making mould quotation will be finished in 1 or 2 days according to the drawing & sample which you supplied.

3. Negotiation The negotiation includes quality, price, material,delivery time,payment term,ect.

4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design.

5. Mould We will build the mould based on customers's requirements. Before making the mold, we will send mold design to the customers for approval firstly.

6. Mould Testing When mold is finish, we will test the mold to check if the product will be satisfied with customer's requirements, and we will send samples to the customers for approval.

7. Delivery We will delivery the goods to the customers either by sea or by air.

 


4cavities Edible Oil Filp Top Cap Mould4cavities Edible Oil Filp Top Cap Mould4cavities Edible Oil Filp Top Cap Mould4cavities Edible Oil Filp Top Cap Mould4cavities Edible Oil Filp Top Cap Mould

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier