Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mould cavity | S136 from Sweden ASSAB with HRC 50-52 |
Mould core | S136 from Sweden ASSAB with or M310 from Austria with HRC 52-55 |
Mould core sleeve | DC11 from Japan or W302 from Austria with 60-62HRC |
Core Central Ejector | Beryllium Copper + Chroming treatment with HRC 62-64 HRC |
Ejector way | Ejector plate+ Ejector sleeve |
Mould Manifold plate | H13 from America for hot runner mold. |
Mould other plate | P20 |
Hot runner system | hot runner |
Free spare parts of mould | Core set : 1set/ cavity: 1 Piece/ hot runner system:1set/PID controller system: 1Set/ other easy broken spare parts for each 8 cavities cap mould. |
Gurantee of the mould | 1 year or 1 million shot times(in this period, if the mold have problem, we will offer the parts or service by free, but not include the problems cased by wrong operation) |
The life of the mould | 5-6 years, Even in 10 years in good maintenance |
Installation & Commission | Our technician can be the buyer's factory to install and run the mould. But the buyer should bear all the cost for the technician's trip(include the air ticket, the cost of the accommodation and the salary) |
Remark: Our mould different part will used different material. All the material was important and special for making cap mould. The mould material choice can make sure the mould action and mould running life |
Cap mould: grinding--fly cutter--CNC Milling --Drilling --Lathe --Boring lathe --electric pulse --Finishing CNC -- EDM --Polishing --Installing -- Testing3.Interchangeable parts for every cavity.
1. R&D We support customers R&D. We will make the files or improve the design if you need
2. Quotation Making mould quotation will be finished in 1 or 2 days according to the drawing & sample which you supplied.
3. Negotiation The negotiation includes quality, price, material,delivery time,payment term,ect.
4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design.
5. Mould We will build the mould based on customers's requirements. Before making the mold, we will send mold design to the customers for approval firstly.
6. Mould Testing When mold is finish, we will test the mold to check if the product will be satisfied with customer's requirements, and we will send samples to the customers for approval.
7. Delivery We will delivery the goods to the customers either by sea or by air.