• 24/410 Injection Plastic Cap Mould Flip Top Cap Injection Plastic Mold

24/410 Injection Plastic Cap Mould Flip Top Cap Injection Plastic Mold

Shaping Mode: Injection Mould
Surface Finish Process: Heat Treatment
Mould Cavity: Multi Cavity
Plastic Material: PP
Process Combination Type: Compound Die
Application: Household Appliances, Commodity, Home Use, Daily Cosmetic Product
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Zhejiang, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Spanish
to see all verified strength labels (27)

Basic Info.

Model NO.
Flip top cap mould
Runner
Hot Runner / Cold Runner
Design Software
UG
Installation
Fixed
Certification
CE, SGS
Standard
DME
Customized
Customized
Model No,
Bottle Cap Mold
Transport Package
Wooden Package
Specification
600*500*550
Trademark
DAELONG
Origin
Taizhou Zhejiang China
HS Code
848071
Production Capacity
200 Sets/Year

Product Description

Product name 24/410 flip top cap mold
Cavity number Customer's requirement (range from 4-24 cavities)
Mold structure Hot runner or cold runner with inner closing system
Mold core/cavity steel S136,M310,W302,8407,SKD61 
Product material PP
Delivery time 70-80 days after confirmed mold drawing and product drawing
Life time 3,000,000 shots
Package Standard package for oversea




MOULD MANUFACTURE PROCESS

Cap mould: grinding--fly cutter--CNC Milling --Drilling --Lathe --Boring lathe --electric pulse --Finishing CNC -- EDM --Polishing --Installing -- Testing

BUSINESS STEPS

1. R&D We support customers R&D. We will make the files or improve the design if you need
2. Quotation  Making mould quotation will be finished in 1 or 2 days according to the drawing & sample which you supplied.
3. Negotiation   The negotiation includes quality, price, material,delivery time,payment term,ect.
4. Mould Design  We need to spend 3-5 days on mould and product 3D/2D drawing design.
5. Mould  We will build the mould based on customers's requirements. Before making the mold, we will send mold design to the customers for approval firstly.
6. Mould Testing  When mold is finish, we will test the mold to check if the product will be satisfied with customer's requirements, and we will send samples to the customers for approval.
7. Delivery   We will delivery the goods to the customers either by sea or by air.



FAQ

Q: What is your trade term? 
A: Normally FOB Ningbo or Shanghai 
Q: What is your payment term?
A: 30% down payment against PO, 70% balance payment before the shipment.
Q: What is your delivery time?
A: Normally in 55-65 days , depend on the mold structure.


IF YOU WANT TO KNOW MORE INFO, PLEASE CONTACT ME.

Steven Rao
TAIZHOU HUANGYAN DAELONG MOLD CO.,LTD
 
 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
117
Year of Establishment
2006-07-25